Skip to main content

Crystal Street Streetscape Project

Submitted by Anonymous (not verified) on

The Borough of East Stroudsburg is holding a Public Information meeting on September 26, 2022 at 6:00 p.m. to receive public input on the proposed Crystal Street Streetscape Project.

Phase one of this Project will make Crystal Street one-way from Analomink Street to Washington Street, Add sidewalk width to both sides of Crystal Street from Analomink Street to Washington Street, add a raised Pedestrian Crosswalk where the current Crosswalk is in front of Trackside and add additional decorative street lighting.

Phase two of this project will add a new sidewalk with decorative street lighting from the Prospect Street Bridge down Crystal Street to Washington Street and provide additional parking on the East side of Crystal Street along the railroad tracks.

Click on the links below to see the proposed changes.

Analomink Street to Washington Street

Washington Street to Ridgeway Street

Contact the Monroe County Reporter

Send tips, stories to mail@monroecountypa.com or use our Contact form